Tower Installed

Our trusty tower team consisting of John, KI4UIP; Donn, N4KII and Dave KR4U were at it again. Today (9/27) the tower tilt mechanism was mated with the telescoping tower. The tower mounts to the base with two large bolts that also serve as hinges when the tower goes from horizontal to vertical or vice versa. Once the third leg is bolted to the base, the tower can then be extended to a raised height of approximately 54 feet.

Final installation details include adding tower grounding, installing the rotor, mast, and antenna followed by coax and rotor control cables.

 

twr1
Tower retrieved from “storage.”
twr3
Tower jockeyed into position
twr4
Tower being cranked up
twr5
Finished tower base
twr6
Tower Installed waiting for antenna

 

 