Today (9/20) the crew of Dave, KR4U; Donn, N4KII; and John KI4UIP installed the tower tilt assembly on the concrete base. Notice the ancient Egyptian influence used in keeping the heavy mechanism above the threaded rod so as not to bend the rods. Now we get to prepare the tower while the concrete base continues to cure.
Thanks Guys