Today (9/13) we poured concrete. Four yards (16,000 lbs.) of mud, 200 pounds of re-bar, followed by
by eight ¾” threaded rods. Everything went as planned. As we wait for the concrete to harden, we can now come up with a plan to relocate the log periodic antenna that is currently atop the Glen Martin tower that is mounted on the shipping containers.